Mining value chains run from pit to port, with grades, yields, logistics routes, and cash flows that all interact. These three projects replaced disconnected spreadsheets with one integrated model of the business in River Logic's Enterprise Optimizer® (EO) Decision Engine, able to optimize for whichever objective the business chooses.

  1. Top 3 nickel mining company
  2. Top 3 iron ore mining company
  3. Top 3 coal mining company

Top 3 Nickel Miner

Project Overview

  • This company is one of the world's largest mining companies. It is Australia's fourth largest company (by revenue), formerly the largest.
  • The client is a multistage integrated business covering mining, concentrating, smelting, and refining, with multiple logistics routes between operations and for transporting products to market.
  • The client needed to update its short-term, medium-term, and life-of-asset production planning tools. These existed as separate spreadsheet systems for each time horizon, with no integration between physicals and cash flows.

Solution

  • River Logic's partner ran a six-week MVP to prove the model's capability and value opportunity.
  • The MVP produced a fully working model of one plant, with operational and financial data, for a 12-week time horizon.
  • Five scenarios were compared:
  • Impact on operations of increasing the foreign exchange rate
  • Impact on operations of decreasing the foreign exchange rate
  • 1A down: notional cash flow impact of removing 1A
  • Half cliffs: notional cash flow impact of halving the volume of cliffs
  • Changing the concentration and recovery requirements for nickel
  • Objective functions: notional cash flow, revenue, volume, grade, and cost

Impact

  • A 3% increase in notional cash flow from optimization affecting grade and product
  • Optimized for revenue, including assessment of the foreign exchange effect
  • Optimized to maximize nickel content and revenue
  • A 6% cost reduction from standardizing concentrator flow

Top 3 Iron Ore Miner: Planning and Scheduling

Project Overview

  • One of the world's largest mining companies
  • Australia's fourth-largest company (by revenue), formerly the largest
  • $65B in revenues, over 240M tons of iron ore
  • Looking to replace its short- and medium-term planning systems for mine, rail, and port, moving from multiple tools to a single integrated system
  • Planning and scheduling was highly time-consuming and used over 60 spreadsheets
  • Minimal integration across the supply chain and time horizons
  • Manual processes were used to gather data from multiple sources

Solution

  • The minimum viable product was completed within three weeks, delivering a port model in a single tool, the EO Decision Engine, to validate the approach, business case, and project timing.
  • The MVP proved the Decision Engine could replace all current processes and serve multiple time horizons, extending across the supply chain from mine to port and including operational, financial, and variable data.
  • The new logistics planning tool:
  • Integrated the supply chain
  • Reduced the size of the planning team, reallocating people to an "insight" role
  • Reduced total planning time for the short and medium term
  • Included operational, financial, and maintenance data, along with weather events
  • Offered real-time what-if capability

Impact

  • A single integrated system for mine, port, and rail that replaced 60 spreadsheets
  • A solution accessible to multiple business areas through a single-portal user experience
  • The ability to optimize on multiple objective functions (e.g., volume, cost, revenue)
  • Automated transfer of production data into integrated planning systems for mine, port, and rail
  • Handling of multiple grade requirements (e.g., vessel product configurations, lump/fine splits)
  • Expected impact of 4–5% net margin improvement

Top 3 Coal Miner

Goal: Maximize profit by optimizing mining assets with a transparent, integrated system across the coal chain.

Problem Statement

  • Within CMJV there was no integrated, intuitive system linking mine schedules, washing strategies, blend plans, and shipping schedules that would let users make optimal planning decisions.
  • Stopgap spreadsheet solutions were in place for short- and long-term planning.
  • The company wanted to move from multiple spreadsheets to a single integrated model for supply chain optimization, with a strong cloud-based interface for multiple users to analyze and view results.

Scope

Deliver an integrated long-term (12-month) and short-term (60-day) planning tool that takes these inputs:

  • Mining schedule
  • Multi-density yield and product quality model
  • CHPP time utilization and feed rates
  • Stockpile capacities
  • Starting stock position and quality
  • Shipping schedules and customer qualities

Based on these inputs, the optimizer generates an optimal processing and blending solution for a given objective:

  • Maximize sales volume
  • Maximize margin
  • Maximize cash

Model Characteristics

  • ROM-to-ship model for CMJV, including ROM stockpiles, CHPP, product stockpiles, rail, and port
  • 18-month model horizon, with daily, weekly, and monthly time periods as required (at minimum, the first 4 months in weekly periods)
  • Inputs by pit/strip/block, with quality parameters
  • Up to 4 density cut options at the CHPP, with associated yields
  • Maximum capacities for all stockpiles (ROM and product)
  • Quality parameters of Ash, VM, Phos, TS, and FL
  • Quality parameters associated with each product
  • Maximum train capacity for each distinct route
  • Base currency AUD, with USD prices
  • 24/7 operations with downtime factors and planned maintenance hours

Early Insights Delivered

  • Greater visibility and clarity across the organization through planning with integrated operational and financial data, including what data drives the solution and the ability to drill into outputs
  • Robust conversations across teams about objective functions (revenue vs. cash flow vs. throughput, etc.)
  • Alignment of operational and financial trade-offs, backed by a data-driven, optimized rationale (wash density vs. yield)
  • Agility and speed of scenario generation (20 min vs 3 days)
  • Removal of subjectivity and manual manipulation from key operational and financial decisions
  • Standardization and centralization of ongoing planning processes
  • Additional use cases identified that will deliver business value, based on the success and results of the implementation to date

What Was Achieved

The company needed an integrated planning platform that provides a single source of truth for planning decisions from the ROM stockpile through ship loading, with optimization for multiple objective functions, including profit, cash flow, and throughput.

Value created:

  • Early identification of uncommitted sales opportunities, increasing revenue by 5% within a 16-week plan
  • Reduced avoidable demurrage costs through model solutions that optimize shipping nominations
  • Greater visibility and clarity across the organization through planning with integrated operational and financial data
  • Wash and blending plans that tighten control of product specifications, avoiding losses on products over specification and penalties on shipments under contract specifications

The Common Thread

In each case, one integrated model in the EO Decision Engine replaced disconnected spreadsheets, linked physical operations to financial outcomes, and let the business choose and compare objectives, with answers it could trace back to the data.

Schedule a demo of the EO Decision Engine.

Watch How EO Decision Engine Works

Our Customers & Partners

Merck
PwC
Accenture
Microsoft
Gurobi
Kenvue
Georgia-Pacific
Bristol Myers Squibb
Tronox
ToolsGroup
ZS
McKee Foods
Philip Morris International
Yorkshire Water
Brookes
AlixPartners
Finstock
BMA
Tengler
Transnova
Cornerstone
Tarmac
Boise
Merck
PwC
Accenture
Microsoft
Gurobi
Kenvue
Georgia-Pacific
Bristol Myers Squibb
Tronox
ToolsGroup
ZS
McKee Foods
Philip Morris International
Yorkshire Water
Brookes
AlixPartners
Finstock
BMA
Tengler
Transnova
Cornerstone
Tarmac
Boise